SUBSTATION ENGINEERING: This project converted an existing 138‐kV “tapped” (or switch-connected substation) to a three‐breaker ring bus equipped with relaying, controls and real-time monitoring. Services included: 1) engineering and design of the complete 138‐kV ring bus substation and transmission line cut‐in including all required permits; 2) procuring all material and equipment; and 3) construction including site grading and development.
TRANSMISSION ENGINEERING: This portion of the project consisted of the Engineering, Procurement, and Construction (EPC) of 138 kV transmission line taps to enable conversion of the existing air‐break switch connected substation to a three‐breaker ring bus equipped with relaying, controls, and real-time monitoring. We provided EPC services for:
1) Engineering and design of the 138‐kV transmission line cut‐in including all required permits;
2) Procuring all material and equipment including self‐supported steel poles; and construction