INDUSTRIAL OIL AND GAS

New Industrial Substation

SEnergy provided turn-key engineering services as the prime member of the EPC teams for this large substation. It was designed and built to support both a new gas plant and an existing gas plant in West Texas. The substation included two 138kV-4160V, 24MVA power transformers built to feed a new cryogenic gas plant and one, 138-22kV, 15kV transformer necessary to support an existing gas plant. The substation includes four 138kV gas circuit switchers, 138kV, 24MVA power transformer, three 25kV vacuum circuit breakers, a 5kV switchgear line-up with eleven vacuum breakers, arc-flash protected, and three-capacitor banks for power factor correction. SEnergy provided all civil, electrical structural, protection, and control engineering, specifications for equipment procurement, and construction support. SE also coordinated with the transmission service provider for the design and construction of the transmission interconnect. (2012-2013)

Related

Projects

Power Engineering

Contact

Get In Touch

Contact

Get In Touch