SEnergy performed EPC services for four substations electrifying a gas pipeline located in South Texas. Scope of engineering design services included: Site Work, Transmission line, Electrical and Structural, Protection and Control; development and implementation of protective relay settings; specification of major equipment to be purchased directly by the Client; Procurement of substation structures, transmission and distribution equipment and materials; Fulltime, on-site construction management through commissioning.
Project Highlights:
SUBSTATION 1: 69×138 kV – 4.16 kV, 20 MVA substation with 4- 4.16 kV distribution feeders.
SUBSTATION 2: 69×138 kV – 4.16 kV, 20 MVA substation with 2- 4.16 kV distribution feeders.
SUBSTATION 3: 138 kV – 4.16 kV, 20 MVA substation with 4- 4.16 kV distribution feeders.
SUBSTATION 4: 138 kV/13.8 kV, 2-20 MVA transformer substation with 2-138 kV transmission, and 13.8 kV metal-clad switchgear secondary with 8 feeders.
(2018-2020)