ELECTRIC COOPERATIVES

Transmission Line Rebuild

This four-mile 138 kV project in Wimberley, Texas consisted of rebuilding and upgrading an existing 69 kV line. SEnergy’s scope of work included: Landowner coordination and easement procurement; CCN support; transmission and substation engineering and materials procurement support, and construction support through commissioning and As-Built Drawings. Updated schedules and preparing progress reports; On-site Construction Management; Coordinated line survey and structure staking; Designed structures and foundations in accordance with all applicable codes including ASCE and NESC standards; Prepared plan and profile drawings in PLS-CADD; Provided all engineering information, data, and drawings required for procuring all necessary permits, licenses, franchises, authorizations from public bodies, including agreements with respect to the crossing of navigable streams, railroads, and power lines. (2018-Current)