Uvalde Distribution Line Upgrade

SEnergy led a 12.9-mile distribution line upgrade in Uvalde, Texas, delivering overhead and underground design, permitting, and construction support to enhance regional power reliability
Master Planned Subdivision

This subdivision is a master-planned, artisan-inspired community located in Central Texas. Once completed, this subdivision will total 1,240 acres with 2,480 homes overall. SEnergy is performing electrical and gas design, with the scope of work including: Engineering analysis of underground electrical distribution system; Preparation of construction drawings for underground electrical and gas systems; Providing construction specifications and general material take-offs for the installation of electric and gas URD primaries; Providing description of major material items to be installed; Providing layout drawings to bidding entities and utility; Performing interim inspections during construction; Preparing Final “As-Built” drawings; Providing material and labor bidding document with description quantities; Answering RFIs as requested; SEnergy also designed a new substation being fed by two 138kV transmission line feeds. The scope of this project was to add a new 46.7 MVA power transformer bank including new distribution breakers, total breaker, tied breaker, and related structures. SEnergy performed engineering design, plans and drawings, construction bidding and contracting, as well as construction coordination and inspection.
Distribution / Staff Augmentation

SEnergy began working for this West Texas Utility in 2013, and once purchased by another Utility, continued work in late 2017 under the existing contract.
EPC / Owner’s Engineer for Multiple Distribution Projects

SEnergy was the Owner’s representative during construction for these projects located in West Texas, serving as the liaison between the contractor and Owner.
Transmission / Distribution

This Transmission and Distribution System is a program to develop electrical infrastructure to serve power needs in the Delaware Basin in West Texas.
Make-Ready Evaluation

For this Electric Cooperative located in East Texas, SE performed Pole Attachment Make-Ready Evaluation and Engineering services for over 1,900 poles from January 2013 – July 2017.
Bike and Pedestrian Project

This project consisted of rebuilding sections of the overhead distribution line to accommodate a road widening and adding sidewalks and pedestrian/bicycle trails adjacent to the University campus.